Garland Concrete Lifting logoGarland Concrete LiftingGarland, TX
Pool Deck Leveling photo

Garland Concrete Lifting

Pool Deck Lifting in Garland, TX

Pool deck lifting in Garland, TX raises sunken deck sections with foam injection, no draining required. Free estimates.

  • 15+ Years local experience
  • 500+ Projects completed
  • Licensed & Insured

Serving Garland and nearby communities.

Pool decks sit on the same clay soil driving driveway and patio settlement across Garland, but the water nearby speeds things up. Erosion under the slab near a pool's edge happens faster than in a dry backyard corner.

Garland Concrete Lifting lifts pool decks without draining the pool. Injection points are set back from the coping and water line, and the crew works carefully around any pool equipment lines buried near the deck edge.

What's included

What's Included with Pool Deck Lifting

  • Coping inspection — checking where the deck has pulled away from the pool edge.
  • Setback injection points — holes placed away from equipment lines and the water's edge.
  • Level verification — deck re-checked against the coping for a flush transition.
  • Patch and finish — holes sealed to match the existing deck surface.
  • Optional — joint sealant around the coping to slow future water intrusion.
  • Customer prep — clear pool furniture and equipment from the deck area.

How it works

How Our Pool Deck Lifting Process Works

  1. Slope assessment photo
    Step 1

    Inspect the coping line

    Check for gaps or drop between deck and pool edge.

  2. Seal drill points photo
    Step 2

    Mark setback injection points

    Placed away from equipment and water lines.

  3. Foam or slurry injection photo
    Step 3

    Drill access holes

    Small holes sized for controlled lightweight injection.

  4. Low-pressure injection photo
    Step 4

    Inject foam

    Pumped carefully to avoid overshooting near the pool edge.

  5. Recheck the transition photo
    Step 5

    Recheck the transition

    Deck-to-coping line verified flush.

  6. Hole patching photo
    Step 6

    Patch and clean

    Holes filled, deck ready for foot traffic.

Timeline

How long does a Pool Deck Lifting take?

  1. 01

    Inspection

    same visit.

  2. 02

    Injection

    1–2 hours

    depending on deck perimeter length.

  3. 03

    Cure time

    same day

    usable again in most single-section jobs.

  4. 04

    Larger perimeter jobs

    half day

    for full deck correction.

Need a schedule that fits?

Get a Free Estimate

Before & after

Before and After Pool Deck Lifting

  • Pool Deck Lifting photo
    Before
  • Pool Deck Lifting photo
    After

FAQs

Pool Deck Lifting FAQs

Can you lift a pool deck without draining the pool?

Yes. The pool stays full. Injection points are set back from the water's edge, so the work happens around the pool, not in it.

Does foam injection near a pool damage equipment lines?

Not when injection points are planned carefully. That's part of the inspection, mapping where equipment lines run before drilling anything nearby.

What causes pool decks to settle faster than other slabs?

Water erosion under the slab near the coping speeds up the same clay soil movement that affects driveways and patios elsewhere on the property.

Next step

Get a Pool Deck Lifting Estimate in Garland

Call Garland Concrete Lifting or request a free estimate. Your pool stays full the whole time.

Related: Patio Slab Lifting · Home

---

Ask about Pool Deck Lifting

Tell us about the project and how to reach you.

Call (254) 282-6228